Ecompact 250 Install backed up by 3 Phase Solar PV

Ecompact 250 Install backed up by 3 Phase Solar PV

For this customer, they already had a large solar PV array supplying some power to the house across 3 phases. We are currently undertaking the work, we have installed an Ecompact 250 to heat the water for the customer in the times when their is not enough sun, for...
Two Bathrooms For A North Cornish Coast Holiday Home

Two Bathrooms For A North Cornish Coast Holiday Home

For the customer, we were asked to replace an existing bathroom in their holiday home, with 2 separate bathrooms. One being an en-suite for the master bedroom, and another for the rest of the house.  This required some significant remodelling work to the house, which...
The Malthouse

The Malthouse

For this customer, we have installed a Ecompact 290 alongside a large thermal store so that the heat from the biomass boiler can last as long as possible and allow enough of the water to be drawn off of it, and be kept...
Chapmans Well

Chapmans Well

We were asked to replace an old oil boiler, for a new an efficient Klover Ecompact 250. This system simply replaced the old boiler so was added into the heating system, without much other work done to the central heating system. This allowed the customer to have cheap...
Pulley

Pulley

For this project we needed to replace old night storage heaters for the customer, and this was replaced by a Klover Diva. Alongside this installation we had to fit a hot water cylinder and a full central heating system within the...